Prepare for the appointment before choosing a moving date
Before accepting the keys to a Dubai property, check the handover instructions, compare the home with the agreed documents and record anything that remains unfinished. Keep the inspection, the financial statement and the acceptance paperwork connected.
Read the developer’s notice against your sale and purchase agreement, including any amendments. Confirm the unit, appointment arrangements, amounts requested and documents you need to bring. Ask which services will be operational for the inspection and whether you may bring an independent inspector.
Prepare a folder containing your agreement, relevant plans and specifications, receipts, correspondence and the latest statement of account. Request clarification of unfamiliar charges before the appointment. Do not assume that collecting keys completes every registration or ownership formality; ask what remains outstanding for your unit.
Inspect the agreed home, room by room
Take the agreed floor plan and specification with you. Start with the unit number, layout, parking and any separately allocated storage. Check included fittings and appliances against the documents rather than relying on your memory of a show apartment.
Work through each room in the same order. Look at floors, walls and ceilings, then doors, windows, cupboards and fittings. With the developer’s authorised staff, arrange demonstrations of cooling, taps, drainage, lights and included appliances where services are available. Do not open electrical panels or attempt invasive tests yourself.
- Look for damaged finishes, leaks, staining and incomplete fittings.
- Open ordinary doors, windows and cupboards with permission; note sticking, gaps or damaged seals.
- Ask for any inaccessible or untested item to be recorded, with an arrangement to check it later.
- Confirm the parking space, access route and any storage allocation.
A visual walk through is useful, but it cannot establish the condition of concealed systems. Bring in a suitable specialist when the issue needs technical assessment. Our floor plan guide helps you prepare the layout questions before the visit.
Make the defect list specific enough to act on
Give each issue a location, a short description and a clear photograph. “Bedroom window, lower right corner, seal separated from frame” gives someone a much better starting point than “windows poor”. Keep the original photographs and a copy of the submitted list.
Use the developer’s designated reporting process and ask for an acknowledgement or reference number. Request the proposed repair arrangements, a contact person and a way to confirm when work is finished. If something cannot be tested, record that distinction rather than marking it satisfactory.
Read any acceptance or handover declaration before signing. Make sure you understand how it records outstanding work and what it says you are acknowledging. If a significant defect or disputed wording affects your decision, seek advice on your agreement. Do not assume that identifying a snag automatically changes a payment deadline.
Arrange utilities and the ownership budget
DEWA’s move in service lists residential security deposits of AED 2,000 for a flat and AED 4,000 for a villa, with activation charges in addition. Keep the deposit separate from fees in your cash budget and check the applicable refund conditions. The owner application uses a title deed or sale and purchase agreement through DEWA’s digital channels; the automatic Ejari process described on that page concerns tenants.
Ask building management about any separate cooling account, moving permit, access registration or other arrangements for your home. Confirm the amounts and process with the relevant provider instead of assuming they are covered by the utility deposit.
Request the unit’s service charge information and the period covered by any advance payment. Our service charge guide explains how to check the building, year and separately billed items.
Leave with the records you will need later
Count keys, cards and remotes against a written list. Ask for appliance manuals and warranties, relevant maintenance information, emergency contacts and the procedure for reporting later defects. Keep repair visits and completion confirmations with the original inspection list.
For jointly owned property, Article 40 of Dubai Law No. 6 of 2019 distinguishes structural defects from specified defective installations. It provides ten years for structural liability from the project completion certificate and one year for the listed installations from unit handover. If an owner refrains from taking possession, the installation liability period instead starts from the completion certificate. Other applicable rights and warranties are not displaced.
Those distinctions matter more than a general promise that every problem has the same reporting window. Confirm the relevant dates, report problems promptly and obtain advice if responsibility is disputed. Before arranging your move, make sure the open work, next appointment and person responsible are all recorded.
Have a question about a property you are considering?
Talk it through with Houzez